Move the MEWP for transport

6.6-2 Hoist the MEWP

WARNING
Only qualified riggers must operate the machinery
during a lift.
1. Rotate the boom and position the MEWP as
shown in
Figure
05.
2. Turn the main power disconnect switch to the
off position.
3. Remove all personnel, tools, and materials from
the platform.
WARNING
When you hoist the MEWP , the lifting devices must
be attached to the designated lift points only.
WARNING
Use chains with a load capacity sufficient to
withstand the MEWP weight. Refer to the serial
plate of the MEWP for the specified weight.
TRANSPORT
TIE-DOWN POINTS
NOTE
Horizontally, the center of gravity is approximately in the middle of the MEWP , front to rear and side to side.
Vertically, the center of gravity is approximately a small distance above the chassis.
SJ82 T, SJ86 T
LIFTING POINTS
C L
X
77in
77in
1.95m
1.95m
X (81/86T) = 20 " (508mm)
Figure 05 Lift points and approximate center of gravity
4. Attach the rigging to all four lift points as shown
in
Figure
05.
5. Adjust the rigging to make sure the MEWP stays
level when you hoist it. Refer to
center of gravity location.
LIFTING POINTS
TRANSPORT
TIE-DOWN POINTS
Section 6 – Additional Procedures
Figure 05
for the
213205AAA
75

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sj86 t

Table of Contents