Areca ARC-1880 Series User Manual page 163

6gb/s sas raid cards
Table of Contents

Advertisement

2. In order to make sure of all the capacity is available for your
battery cells, allow the battery cell to be fully charged when in-
stalled for the first time. The first time charge of a battery cell
takes about 24 hours to complete.
B-7 Changing the Battery Backup Module
At some point, the LI-ION battery will no longer accept a charge
properly. LI-ION battery life expectancy is anywhere from approxi-
mately 1 to 5 years.
1. Shutdown the operating system properly. Make sure that
cache memory has been flushed.
2. Disconnect the BBM cable from J2 on the 6Gb/s SAS RAID
controller.
3. Disconnect the battery pack cable from JP2 on the BBM.
4. Install a new battery pack and connect the new battery pack
to JP2.
5. Connect the BBM to J2 on the 6Gb/s SAS RAID controller.
Note:
Do not remove BBM while system is running.
B-8 Battery Functionality Test Procedure:
1. Writing amount of data into controller volume, about 5GB or
bigger.
2. Waiting for few seconds, power failed system by remove the
power cable.
3. Check the battery status, make sure the D13 is bright light,
and battery beeps every few seconds.
4. Power on system, and press Tab/F6 to login controller.
5. Check the controller event log, make sure the event shows
controller boot up with power recovered.
B-9 BBM Specifications
Mechanical
• Module Dimension (W x H x D): 37.3 x 13 x 81.6 mm
• BBM Connector: 2 x 6 box header
Environmental
APPENDIX
163

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents