Loma IQ2 Service Manual page 12

Hide thumbs Also See for IQ2:
Table of Contents

Advertisement

The control board can also be fitted with an optional reports package supporting
an on board real time clock and date function together with a range of standard
reports and logs as shown in the equipment user manuals.
The control unit is compatible with the following Loma communication packages.
LomaNet - Optional node, serial link board, reports and logs package and
external connectors required.
LomaLink - Optional serial link board, reports and logs package and external
connectors required.
Electrical Supplies
Electrical supplies are connected to the control unit directly into the bottom of
the control unit via waterproof glands.
Control unit connection details can be found in the -
Source"
on page 12
For specific wiring connection information including any conveyor wiring
diagrams, please refer to the "Wiring Diagrams" package in your Customised
User Manual.
Spurious Triggering
The Loma range of Metal Detectors is the product of many years' experience
and development. They are inherently reliable. Provided a detector is set up as
described in the setting up procedure, it is unlikely that any problem lies within
the head assembly or control unit.
Sources of spurious or false triggering can be:
Module 5092
in the "Maintenance" section of this manual.
Operator rings or watches.
Belt contamination even by small particles of rust.
Remember to clean the underside as well as the top surfaces you
can see.
Metallic belt clips even if plastic coated.
Metallic guide rails particularly into the metal free area.
Product Description and Environment
"Connecting to a Power
3-3

Advertisement

Table of Contents
loading

Table of Contents