IBM Power775 Service Procedure page 164

Disk enclosure chassis service procedure
Hide thumbs Also See for Power775:
Table of Contents

Advertisement

---- Appendix G: FDT Pressure Test Calibration Procedure ----
• Tank Level:
• Pressure Test Calibration:
16. Before proceeding, read required safety information:
CAUTION:
The water-based coolant solution may contain an additive intended to inhibit
corrosion (or provide other functions). The solution may cause irritation to the skin or
eyes. Avoid direct contact with the solution. Employ appropriate Personal Protective
Equipment when performing operations involving the coolant or which may potentially
expose you to the coolant. Refer to the MSDS for more information. (C037)
CAUTION:
Protective eyewear is needed for the procedure. (L011)
CAUTION:
Chemical resistant gloves are needed for this procedure. (L014)
DANGER:
Risk of electric shock due to water or a water solution which is present in this
product. Avoid working on or near energized equipment with wet hands or when spilled
water is present. (L016)
17. Remove hose assembly HA1 from the upper tool storage compartment.
Power775 Disk Enclosure Chassis Service Procedure
Upper Half, Lower Half or Empty – OK. Check next Status
item.
Full – action required.
Exit this procedure and perform the Power 775 Fill and Drain
Tool (FDT) Tank Drain Procedure.
Once FDT tank level is Upper Half, Lower Half or Empty,
return to this step and continue with procedure.
Incomplete - OK. Proceed to next step.
Pass or Fail – action required.
Click the Deactivate FDT button.
Repeat Step 13 and continue with procedure.
Page 164 of 171

Advertisement

Table of Contents
loading

Table of Contents