IBM Power775 Service Procedure page 130

Disk enclosure chassis service procedure
Hide thumbs Also See for Power775:
Table of Contents

Advertisement

12. Select the BPC port that the FDT was plugged into in Step 6 from the FDT Port
Locations: list.
13. Click the Activate FDT button.
• If the Activate FDT command is successful – OK. Wait 30 seconds and
continue to next step.
• If the Activate FDT command fails – action required.
Click the Deactivate FDT button.
Wait 2 minutes and repeat Step 13. If the Activate command fails again,
contact next level of support.
14. Click the Get FDT Status button.
• If the Get FDT Status command is successful – OK.
See below for a sample status (does not reflect expected state)
• If the Get FDT Status command fails – action required.
Repeat Step 14. If the Get FDT Status command fails again, contact next
level of support.
Power775 Disk Enclosure Chassis Service Procedure
---- Appendix E: FDT Tank Drain Procedure ----
Page 130 of 171

Advertisement

Table of Contents
loading

Table of Contents