Calibrating The Dosing Rate - ProMinent Hydro/4 Operating Instructions Manual

Metering pump
Table of Contents

Advertisement

10.3

Calibrating the dosing rate

a)
1
2
Fig. 22: a) Adjust indicating dial, b) Schematic assembly for calibration
It is only worth calibrating the dosing rate if you wish to carry out particu‐
larly precise metering at a completely different back pressure.
The dosing rate of the hydraulic diaphragm metering pump is only
dependent upon back pressure to a minimal extent. And the pumps are
calibrated on the factory premises to the maximum operating pressure.
(Values of the maximum operating pressures - see the pressure stage on
the indicating dial or safety relief valve).
The plant or production facility can calibrate each pump to a back pressure
that is lower than the nominal pressure ordered.
The following pressure stages (in bar) are available:
Pump
7
HP4
X
WARNING!
ATEX pump only: Take suitable precautions in potentially
explosive atmospheres regarding the feed chemical in the
open measuring cylinder - see handling instructions below.
The dosing rate can only be calibrated when the discharge
line is connected and under normal operating conditions. As
the dosing rate is dependent upon the actual back pressure.
4
5
Materials required:
Measuring beaker
n
Stop watch
n
1.
Switch off the pump.
2.
Turn the stroke adjustment dial to maximum, beyond 100 % to the
stop.
3.
API versions only: Remove the metal cap from the stroke adjust‐
ment dial.
4.
Remove the cover (4) from the stroke adjustment dial and slacken
off the screw (3) beneath slightly.
5.
Guide the suction line into a measuring beaker - see Fig. 22.
6.
Fill the measuring beaker with feed chemical.
7.
Start the pump.
10
16
X
X
b)
t
1
Q
1
t
2
Q
2
Repairs
25
X
51

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hp4a

Table of Contents