ProMinent Hydro/4 Operating Instructions Manual page 21

Metering pump
Table of Contents

Advertisement

Fastening
m
m
P_MOZ_0015_SW
Fig. 10
Dosing rate too low
Vibrations can disrupt the liquid end valves.
DN
1.
Take the dimensions (m) for the fastening holes from the appro‐
priate dimensions- or data sheets.
2.
Fix the pump base to the supporting floor with sufficient strong
screws.
With externally mounted pumps fix the frame to the supporting floor
with sufficient strong screws.
Secure the metering pump so that no vibrations can
occur.
Assembly
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hp4a

Table of Contents