Metering pump
Table of Contents

Advertisement

Installation
Fig. 12: Moulded composite seals with
corrugated insert
24
Fig. 11: Connect the steel piping to the plastic pump body as shown
1
Steel pipe
2
Flexible pipe section
3
Plastic valve body
P_SI_0021
CAUTION!
Uncontrolled flow of feed chemical
Feed chemicals can leak through a stopped metering pump if
there is back pressure.
Use an injection valve or a vacuum breaker.
CAUTION!
Uncontrolled flow of feed chemical
Feed chemical can leak through the metering pump in an
uncontrolled manner in the event of excessive priming pres‐
sure on the suction side of the metering pump.
Do not exceed the maximum permissible priming pres‐
sure for the metering pump.
Configure the installation correctly for this purpose.
CAUTION!
Warning against lines coming loose
Suction, discharge and relief lines installed incorrectly can
come loose from the pump connection.
Only use original hoses with the specified tube diameter
and wall thickness.
Only use clamp rings and hose nozzles that correspond
to the respective hose diameter.
Always connect the lines without mechanical tension.
Only connect steel piping via a flexible piping section to
a plastic valve body - see the following figure.
P_MOZ_0021_SW
CAUTION!
Warning against leaks
Leaks can occur on the pump connection depending on the
insert used.
The pump is supplied with PTFE moulded composite
seals with a flare, which are used for the pump connec‐
tions. They seal the connections between grooved pump
valves and the grooved inserts from ProMinent - see .
However, in the event that a smooth insert is used (e.g.
third party part), an elastomer flat seal must be used -
see .
1
2
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hp4a

Table of Contents