Ac Power Cord Installation - Oracle Acme Packet 4600 Hardware Installation And Maintenance Manual

Hide thumbs Also See for Acme Packet 4600:
Table of Contents

Advertisement

Using an 11/32" nut driver, tighten the two kep nuts onto the grounding
3.
post, securing the grounding lug in place. When attached correctly, the
grounding lug fits snugly between the chassis's rear panel and the kep nuts.
Connect the other end of the grounding wire to a suitable grounding point at your
4.
site.

AC Power Cord Installation

This section explains you how to install an AC power cord.
Note:
Use a 15 Amp fused circuit for each AC power supply.
Note:
This equipment is intended for installation in locations where National
Electrical Code (NEC) applies.
To install the AC power cords in the Acme Packet 4600:
Set the System Power switch to the Stby position to cut off power to the Acme
1.
Packet 4600.
Locate the two AC power cords shipped with your Acme Packet 4600. Choose one
2.
power supply to work on first.
Note:
Always make the ground connection first and disconnect it last when
installing or removing the system from an equipment rack.
Chapter 4
Ground and Power Cable Installation
4-14