Oracle Acme Packet 4600 Hardware Installation And Maintenance Manual page 38

Hide thumbs Also See for Acme Packet 4600:
Table of Contents

Advertisement

Chapter 4
Mounting Installation
If you discover that any of the parts are missing or were damaged in shipment, contact
customer support.
Mounting Hardware
The hardware used for the Acme Packet 4600 mounting procedures include the
following:
Front mounting flanges (2) for use with mounting slide rails, used to secure the chassis
into the rack
Slide rail assembly (2), as shipped, with the chassis slide rail inserted into the
equipment rack slide rail.
Equipment rack slide rail (part of the slide rail assembly).
Chassis slide rail (part of the slide rail assembly)
Nut Bar (4)
Mounting Spacer (2)
4-4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Acme Packet 4600 and is the answer not in the manual?

Table of Contents