Turn Off The Module Through At Command - Quectel 5G Series Hardware Design

Hide thumbs Also See for 5G Series:
Table of Contents

Advertisement

Table 10: Turn-off Timing of the Module Through FCPO#
Symbol
Min.
T
6.84s
turn-off

3.5.2. Turn off the Module Through AT Command

It is also a safe method to turn off the module by AT+QPOWD command. For more details about the
command, see document [4].
The module is designed to be turned on with a host GPIO. Pull down FULL_CARD_POWER_OFF# pin
after the module's USB/PCIe is removed. Otherwise, the module will turn on again.
VCC(H)
RESET#(H)
FCPO#
RFFE_VIO_1V8
USIM_VDD
USB/PCIe
Module Status
NOTES:
1. Please pull down FULL_CARD_POWER_OFF# pin immediately or cut off the power supply VCC when the host detects that
the module USB/PCIe is removed.
2.
It is recommended to cut off the VCC after the module is turned off and drive RESET# LOW after the module shuts down.
Figure 11: Turn-off Timing Through AT Command and FCPO#
Table 11: Turn-off Timing of the Module Through AT Command and FCPO#
Symbol
Min.
T
6.84 s
turn-off
RM500Q-GL_Hardware_Design
Typ.
-
3.7 V
1.8 V
≥ 1.19 V
V
IH
1.8 V
1.8 V or 3.0 V
Running
Typ.
-
Max.
Comment
-
Module system turn-off time.
AT+QPOWD
Turn-off procedure
T
turn-off
Max.
Comment
-
Module system turn-off time.
5G Module Series
RM500Q-GL Hardware Design
USB/PCIe removed
OFF
32 / 85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rm500q-gl

Table of Contents