SAB Heli Division Goblin 700 Manual page 41

Raw nitro
Hide thumbs Also See for Goblin 700:
Table of Contents

Advertisement

CHECK LIST
Check the dampening on the main and
1
tail rotor to be the same as always.
Check Tail & Engine belt tension.
5
The tension has to be tight.
9
Check for vertical play of the main shaft.
Tighten the main blades before flight.
2
Check the 2 M3 screws in Clamp.
6
Ensure they are tight.
Check if the FBL-RX connectors are OK
10
(hot glue is recommended).
Check main hub screws(M4 and 2 M2.5)
3
Ensure they are tight.
Check the Main Linkages & Servo Linkages
7
Check the M2.5 bell crank:
11
Belt crank movement must be smooth
and the screw locked.
( It is suggested use a bit of Green Loctite.)
Check all Fuel Line
4
(Good connection).
Check tail pulley set screws:
8
Ensure they are tight.
( It is suggested use a bit of Green Loctite.)
12
Be sure the follow parts are properly
lubricated
*Main shaft/swashplate
*Tail slider/tail shaft
*Carbon rod/carbon rod support
*All thrust bearings
*All plastic balls connections
Page 40

Advertisement

Table of Contents
loading

Table of Contents