Step 8: Manage The Cabling; Step 9. Ground The Ac Modules - enphase IQ8MC Installation And Operation Manual

Ac module
Table of Contents

Advertisement

B. As you install each AC Module, connect the IQ Cable to the microinverter. Listen for a click as the
connectors engage.
C. Cover any unused connectors on the AC cable with IQ Sealing Caps. Listen for a click as the sealing
caps engage.
WARNING: Risk of electric shock. Risk of fire. Install sealing caps on all unused AC connectors, as
these connectors become live when the system is energized. Sealing caps are required for
protection against moisture ingress.

Step 8: Manage the cabling

Use cable clips to attach the cable to the module frame. Leave no more than 1.8 m (6 feet) between cable
clips.
Dress any excess cabling in loops so that it does not contact the roof. Do not form loops smaller than 12 cm
(4¾ inch) in diameter.
WARNING: Loose cables can become a tripping hazard. Dress the IQ Cable to minimize this potential.
NOTE: Some modules do not include framing on their shortest side. Cable clips cannot attach to the
frameless side for cable management. Plan to use the longer, framed side for cable management when
this is the case.

Step 9. Ground the AC Modules

Ground the AC Modules per the module manufacturer's instruction.
19
IQ8MC, IQ8AC, and IQ8HC Installation and Operation Manual
© 2023 Enphase Energy Inc. All rights reserved.