Step 5: Manage The Cabling - enphase IQ8 Installation And Operation Manual

Microinverters
Hide thumbs Also See for IQ8:
Table of Contents

Advertisement

After you have created the installation map, use the Enphase Installer App (mobile app) to record
serial numbers and configure the system.
For details, refer to "Detect the Microinverters" in the help topics of the Enphase Installer App.
A. Peel the removable serial number label from each microinverter and affix it to the respective
location on the paper installation map.
B. Peel the label from the IQ Gateway and any IQ Battery (if installed) and affix it to the
installation map.
Always keep a copy of the installation map for your records
C.

Step 5: Manage the cabling

A. Use cable clips or tie wraps to attach the cable to the racking. Leave no more than 1.8 m (6 ft)
between cable clips or tie wraps.
B. Dress any excess cabling in loops so that it does not contact the roof. Do not form loops
smaller than 12 cm (4¾") in diameter.
WARNING: Tripping hazard. Loose cables can become a tripping hazard. Dress the IQ Cable
to reduce this risk.
18
Enphase IQ8, IQ8+, IQ8M, IQ8A, and IQ8H Microinverters
Cable clip
© 2024 Enphase Energy Inc. All rights reserved.
.
Affix serial number labels
January 2024
IOM-00068-1.0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq8+Iq8mIq8aIq8h

Table of Contents