Installation - ADC TrueNet 1U Installation And Cable Routing Instructions

Fiber panel
Table of Contents

Advertisement

ADCP-92-082 • Issue 2 • 10/2008
Typically, these panels ship empty (without adapter packs, MPO cassettes, splice trays, or
pigtails), but they may also be ordered with any of these components already installed.The panel
accommodates adapter packs and MPO cassettes. The 1U termination and splice panel has one
splice tray. The 2U termination and splice panel has two splice trays.
external features of a 2U panel.
RADIUS LIMITERS FOR
CABLE MANAGEMENT (8)
BULKHEAD
ACCOMMODATES
ADAPTER PACKS OR
MPO CASSETTES
CABLE CLIP
(2 PER SIDE)
HINGED
FRONT
COVER
COVER

2 INSTALLATION

Installation of a TrueNet panel involves the following tasks:
1. Selecting the mounting brackets (covered in
2. Installing the panel on the rack (covered in
3. (Optional) Installing vertical cable guides (covered in
4. (Optional) Installing adapter packs (covered in
5. (Optional) Installing MPO cassettes (covered in
6. Installing a cable clamp (covered in
7. Routing cables and pigtails (covered in
Page 4
© 2008, ADC Telecommunications, Inc.
REMOVABLE REAR
COVER PROVIDES
EASY ACCESS FOR
CABLE ROUTING
AND MANAGEMENT
OSP CABLE ENTRY
(EITHER SIDE)
TRAY LOCATION
LATCH
DESIGNATION
LABEL (2)
Figure 2. TrueNet 2U Panel External Features
SPLICE
TRAY RETAINING
CLIPS (2 PER SIDE)
SLIDING
TRAY
Section 2.1
on next page);
Section 2.2 on Page
Section 2.3 on Page
Section 2.6 on Page
Section 2.7 on Page
Section
3);
Section
4).
Figure 2
shows the
MOUNTING
BRACKET (2)
22053-A
6);
7);
11);
12);

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TrueNet 1U and is the answer not in the manual?

This manual is also suitable for:

Truenet 2u

Table of Contents