Mpo Termination Only Panel Procedures; Routing Mpo Trunk Cable, Right Side Entry (Mpo Adapter Packs) - ADC TrueNet 1U Installation And Cable Routing Instructions

Fiber panel
Table of Contents

Advertisement

ADCP-92-082 • Issue 2 • 10/2008
4.3

MPO Termination Only Panel Procedures

4.3.1

Routing MPO Trunk Cable, Right Side Entry (MPO Adapter Packs)

For right side cable entry in a panel with MPO adapter packs, route the MPO trunk cable from
the cable clamp position to the splice tray as shown in
here from the perspective of the front of the panel.
REMOVE THESE
RADIUS LIMITERS
FOR RIGHT SIDE
ENTRY
Figure 24. Routing MPO Trunk Cable, Right Side Entry (MPO Adapter Packs)
Page 24
© 2008, ADC Telecommunications, Inc.
CONVOLUTED
TUBING
(PROVIDED)
NOTE:
- DRAWER IN CLOSED POSITION
NOTE:
- TOP COVER NOT SHOWN, FOR CLARITY
- REAR COVER REMOVED
Figure
CABLES SHOULD BE LONG
ENOUGH TO COMPLETELY
PULL OUT THE SLIDING TRAY
24. Note that "right" is defined
MPO TRUNK
CABLE
22180-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Truenet 2u

Table of Contents