UPS5000-S-600 kVA
User Manual (Singapore, Three-phase, Three-wire)
●
Issue 01 (2021-04-14)
Figure 3-24 Signal cable connections of N+X parallel system
BSC master and slave cables are required in a dual-bus parallel system.
3-25
shows the cable connections for a dual-bus system containing two
master systems.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
Figure
63