UPS5000-S-600 kVA
User Manual (Singapore, Three-phase, Three-wire)
Context
● Channel steel and expansion bolts for securing the channel steel should be
● Ensure that the spacing between external sides of a channel steel is 800 mm.
● Cabinet mounting holes must be aligned with channel steel mounting holes,
● Keep the channel steel surface flat.
Procedure
Step 1 Determine the cabinet installation positions on the channel steel based on holes in
the marking-off template for channel steel installation.
Figure 3-9 Mounting hole dimensions (unit: mm)
Step 2 Drill cabinet mounting holes in channel steel by using a hammer drill.
Step 3 Use a pallet truck to move the cabinet to the installation position.
Step 4 Use common M12x60 bolts to secure the cabinets into the mounting holes in the
channel steel and tighten the bolts.
Step 5 Install the front, rear, left, and right anchor baffle plates.
----End
Issue 01 (2021-04-14)
NO TICE
purchased by the customer. The recommended channel steel width is 50 mm or
more.
Secure channel steel to the ground by using expansion bolts.
and secure the cabinet to channel steel with bolts.
NO TE
● A: mounting holes on the channel steel
● B: mounting holes on the floor