Mounting; Removing From The Carrying Case; Mechanical Assembly - HBM BU18 Mounting Instructions

Build-up-system for force measurement
Table of Contents

Advertisement

Available languages

Available languages

BU18
3

Mounting

3.1 Removing from the carrying case

The system is delivered fully assembled. To remove it from the carrying case,
remove the upper attachment from the carrying case. The complete unit can
then be lifted at the central ring nut or alternatively by the three eyebolts at the
side.
ATTENTION
Before lifting, you must check that the ring nut is screwed right down
onto the centering bolt and that this is screwed right down onto the
lifting anchor. The eyebolts at the side must also be screwed right in
(use the wrench).
Use only approved hoisting gear with sufficient carrying force.

3.2 Mechanical assembly

The BU18 comprises a mounting base, the transducer, transducer mounting
base, pendulum and thrust piece assemblies and the top plate with the guide
element. The guide element is not designed to be removed.
The BU18 mounting base and the C18 mounting bases, as well as the
transducers themselves, are connected by centering bolts. These bolts are
interchangeable. A central lifting anchor with centering bolts is attached in the
top plate and three side eyebolts are attached to the BU18 mounting base for
transporting the BU18.
A2306−1.3 en/de
9
HBM

Advertisement

Chapters

Table of Contents
loading

Table of Contents