Fujitsu ETERNUS LT40 S2 Installing, Starting Up And Maintaining page 5

Hide thumbs Also See for ETERNUS LT40 S2:
Table of Contents

Advertisement

Preface
Rack Stability
WARNING
FUJITSU Storage ETERNUS LT40 S2/LT60 S2 LTO Library Installing, Starting Up and Maintaining
To reduce the risk of personal injury or damage to equipment:
Extend levelling jacks to the floor.
Ensure that the full weight of the rack rests on the levelling jacks.
Install stabilizing feet on the rack.
In multiple-rack installations, secure racks together.
Extend only one rack component at a time. Racks may become unstable if more
than one component is extended.
5
Copyright 2018 FUJITSU LIMITED
P3AM-5392-07ENZ0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus lt60 s2

Table of Contents