Placement & Rigging; Clearances And Serviceability - FULTON Endura EDR 750 Nstallation, Operation And Maintenance Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Hide thumbs Also See for Endura EDR 750:
Table of Contents

Advertisement

SECTION 2
EDR-IOM-2014-0318
Placement & Rigging
Proper placement of your Fulton product is essential. Attention paid to
the following points will save a great deal of diffi culty in the future. Correct
placement is the fi rst step to trouble-free installation, operation, and
maintenance.
Adhere to the following for placement and rigging:
1. Check building specifi cations for permissible fl oor loading. Use Table 1 for
unit reference.
2. Conform to all the requirements of all national, state and local codes
established by the authorities having jurisdiction and/or the U.S. to the
National Fuel Gas Code, latest edition. Authorities having jurisdiction
should be consulted before installations are made. Where required by local
codes, the installation must conform to American Society of Mechanical
Engineers Safety Code for Controls and Safety Devices for Automatically
Fired Boilers (ASME CSD-1).
3. Since an external electrical source is utilized, the boiler, when installed,
must be electrically ground in accordance with the National Electric Code,
American National Standards Institute (ANSI) National Fire Protection
Association (NFPA) 70, latest edition.
4. Standard Endura boilers are certifi ed for indoor installation only.
5. Install so that all system components are protected from water (dripping,
spraying, rain, etc.) and debris (dry wall dust, insulation particles, etc.)
during boiler operation and service.
6. Install on a level, non-combustible surface in the vertical position. Concrete
is strongly recommended. The surface must be elevated a minimum of 4"
(102 mm) above the fl oor.
7. Provide combustion and ventilation air in accordance with applicable
provisions of local building codes or: USA – NFPA 54/ANSI Z223.1, Section
5.3, Air for Combustion and Ventilation.
8. Locate the boiler so that the air supply and exhaust piping between the
boiler and outside wall/roof are within the maximum lengths for horizontal
or vertical venting if sealed combustion will be used. See Clearances and
Serviceability section of this manual.

Clearances and Serviceability

Adhere to the following for clearances and serviceability:
1. All local and national codes (NFPA, ANSI, UL, CSA, ASME) must be
followed for proper clearances and serviceability for your boiler or heater.
Authorities having jurisdiction should be consulted before installations are
made.
2. Appropriate front, back, side and top clearances must be maintained
Tender No. MET21-117 ADDENDUM #3
Questions? Please Contact Your Local Manufacturer's Representative
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
INSTALLATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
Competent personnel in accordance
with all applicable local codes
should carry out the installation
of the Fulton equipment. All state
and jurisdictional codes beyond the
scope of the applicable ASME Boiler
and Pressure Vessel Codes, for its
corresponding classifi cation, should
be followed in all cases. Jurisdictional
authorities must be consulted prior to
installation.
A competent rigger experienced in
handling heavy equipment should
handle rigging your equipment into
position.
The equipment must be installed on a
non-combustible surface.
Failure to provide required and
safe access to the equipment
could impede commissioning and
maintenance. Service technicians
are instructed not to commence
commissioning if hazardous
conditions exist.
Failure to provide proper minimum
clearances between equipment and
combustible materials may result in
fi re.
4
CAUTION
Do not allow weight to bear on
equipment components to prevent
damage.
Do not use to directly heat swimming
pool.
Page 29 of 88
2-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr 1000Endura edr 1500Endura edr 2000

Table of Contents