SECTION 2
EDR-PURE-IOM-210617
an area where condensate or vapor could create a
nuisance or hazard.
5. Do not terminate below operable windows and
building openings unless exception is granted by the
authority having jurisdiction.
6. The vent terminations must be at least 4 ft (1.22 m)
horizontally from electric meters, gas meters, regulators,
and relief equipment.
7. When installing inlet and exhaust terminations on
the same wall, the exhaust outlet must be installed
4 feet (1.22 m) minimum above and 10 feet (3.05 m)
minimum downwind from air supply inlet to prevent
flue gas recirculation. Greater separation is strongly
recommended.
8. Under certain wind conditions, some building materials
may be affected by flue products expelled in close
proximity to unprotected surfaces. Sealing or shielding
of the exposed surfaces with a corrosion resistant
material (such as an aluminum sheet) may be required
to prevent staining or deterioration. Flue should be
directed away from surfaces, if possible.
Removing an Existing Boiler
When an existing boiler is removed from a common venting
system, the common venting system is likely to be too large for
proper venting of the appliances remaining connected to it.
At the time of removal of an existing boiler, while the other
appliances remaining connected to the common venting
system are not in operation, the following steps should be
followed with each appliance remaining connected to the
common venting system placed in operation:
1. Seal any unused openings in the common venting
system.
2. Visually inspect the venting system for proper size
and horizontal pitch and determine that there is no
blockage or restriction, leakage, corrosion or other
deficiency, which could cause an unsafe condition.
3. Insofar as is practical, close all building doors and
windows and all doors between the space in which
the appliances remaining connected to the common
venting system are located and other spaces of the
building. Turn on clothes dryers and any appliances
not connected to the common venting system. Turn on
any exhaust fans, such as range hoods and bathroom
exhausts, so they will operate at maximum speed. Do
not operate a summer exhaust fan. Close fireplace
dampers.
Tender No. MET21-117
Questions? Please Contact Your Local Manufacturer's Representative
4. Place the appliance being inspected in operation.
5. Test for spillage at the draft hood relief opening after
6. After it has been determined that each appliance
7. Any improper operation of the common venting system
Assembly of Fulton Multi-Skid Systems
Adhere to the following for multi-skid engineered systems:
1. Refer to the Fulton mechanical/electrical drawings
2. Ensure that equipment orientation allows for operation
3. Align the skids as shown on the drawings ensuring that
4. Ensure the skids are level and flat before fastening
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
Follow the lighting instructions. Adjust the thermostat
so that the appliance will operate continuously.
5 minutes of main burner operation. Do not use the
flame of a match or candle or smoke from a cigarette,
cigar or pipe.
remaining connected to the common venting system
properly vents when tested as outlined above, return
doors, windows, exhaust fans, fireplace dampers and
any other gas-burning appliance to their previous
conditions of use.
should be corrected so the installation conforms with
the National Fuel Gas Code, ANSI Z223.1. When resizing
any portion of the common venting system, the
common vent system should be resized to approach
the minimum size as determined using the appropriate
tables.
during assembly.
interface and maintenance.
skid fasteners (skid joint angles) are matched. The skid
joint angles are a matched set and the edges of the
fasteners should be exactly aligned.
NOTE:
Do not bolt the skids to the housekeeping pad/floor
until all of the piping has been reassembled and tightened.
the skids together with the supplied bolts. The skids
should be leveled front to back, side to side and corner
to corner. Failure to properly level the skids will result
in piping misalignment. A level or laser level should be
used to verify skid alignment (when a standard level is
used, the length should be appropriate for the skid). If
assembling multi-component support stands, attach
sections using the supplied bolts through the tank
Addendum #5 Page 42 of 105
INSTALLATION
2-35

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr 1000Endura edr 1500Endura edr 2000

Table of Contents