FULTON Endura EDR 750 Nstallation, Operation And Maintenance Manual page 43

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Hide thumbs Also See for Endura EDR 750:
Table of Contents

Advertisement

INSTALLATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.
Tender No. MET21-117
2-36
frame mounting plates. These should be hand tight until all of the piping is
assembled.
NOTE:
Note: skids are leveled at the factory using a laser level.
5. Connect the piping between the skids by matching the union connections
and/or flange stamps and tightening. Refer to the mechanical drawing as
necessary to confirm location of spool pieces etc. as the flange stamps are
shown on the drawing in hexagonal callouts. The flange stamps should
matched and aligned (the flange stamps should be directly across from
one another. Rotating a flange will result in piping misalignment). Bolts
should be hand tight until all of the piping is assembled. Refer to the
appropriate instructions to tighten the flanges to the required torque
specifications. Support pipe runs as required.
6. Ensure that a low point drain is installed in the piping.
7. Connect the conduit runs between the skids and tighten conduit
connectors.
8. Locate the supplied wiring for the equipment and pull wiring through
the appropriate conduit runs. Electrical wires are labeled for easy landing.
Connect all wiring per the Fulton supplied electrical drawings.
9. If a header is supplied, mount the header as shown in the mechanical
drawing.
NOTE:
For piping supplied in sections, make up and connect hand tight until all
sections are in place to ensure sections align properly. Sections are match marked
for reassembly.
10. Tighten all connections, including threaded and flanged factory
connections which may loosen during shipment.
11. Pneumatically test the piping (at 15 psig [103 kPa]maximum) prior to filling
the systems.
12. Check bolts and connections for tightness after the first heat up cycle.
Retorquing may be required.
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
SECTION 2
EDR-PURE-IOM-210617
Addendum #5 Page 43 of 105
© Fulton Group N.A., Inc. 2020

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr 1000Endura edr 1500Endura edr 2000

Table of Contents