FULTON Endura EDR 750 Nstallation, Operation And Maintenance Manual page 97

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Hide thumbs Also See for Endura EDR 750:
Table of Contents

Advertisement

SERVICE DOCUMENTS
COMBUSTION SETTINGS: Fuel Type is:
FIRING POSITION:
Fuel Position AZL
Air Position AZL
VFD Position AZL
Blower Ampere
Supply Gas Pressure (InWC)
Manifold Gas Pressure (InWC)
MV Downstream Gas (InWC)
Fan Discharge Pressure (InWC)
Wet (Stack Analyzer) O2%
CO2 %
CO ppm
NOx @ 3%
Excess Air %
Room Ambient Temp. °F
Combustion Air Temp. °F
Stack Temperature °F
Stack Draft (InWC)*
Inlet Water Temp. °F
Outlet Water Temp. °F
Main Flame Signal
OPERATING HISTORY (SIEMENS LMV3):
P-161 Total Faults
P-162 Operating Hours
P-166 Number of Startups
Controller Hours
When complete, please keep this form with the boiler and store a record copy in a safe location. Accurate and
complete combustion and maintenance records detailing compliance with the Installation, Operation, and
Maintenance Manual must be produced for warranty consideration. Please use photocopies or consult your local
Fulton Representative for additional copies of this form.
Tender No. MET21-117
5-12
Natural Gas / Propane (Cirlce One)
P0
P1
P2
LIGHT
* Use only a Slack Tube
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
EDR-PURE-IOM-210617
P3
P4
P5
Manometer or equivalent. The use of a digital manometer is not recommended.
®
Output
SECTION 5
P6
P7
P8
100%
Addendum #5 Page 97 of 105
© Fulton Group N.A., Inc. 2020
P9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr 1000Endura edr 1500Endura edr 2000

Table of Contents