FULTON Endura EDR 750 Nstallation, Operation And Maintenance Manual page 22

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Hide thumbs Also See for Endura EDR 750:
Table of Contents

Advertisement

SECTION 2
EDR-PURE-IOM-210617
Nominal
ID
Pipe Size
Inch (mm)
Inch (mm)
1-1/4 (31.75)
1.380 (35.05)
1-1/2 (38.1)
1.610 (40.89)
2 (50.8)
2.067 (52.50)
2-1/2 (63.5)
2.469 (62.71)
3 (76.2)
3.068 (77.92)
4 (101.6)
4.026 (102.26)
6 (152.4)
6.07 (154.17)
8 (203.2)
7.98 (202.69)
10. When making gas-piping joints, use a sealing
compound resistant to the fuel gas serving the boiler.
11. The boiler gas train has been factory leak tested
however, fittings may loosen during shipment and
installation. After gas piping is completed and before
wiring installation is started, carefully check all piping
connections, (factory and field), for gas leaks. Use a soap
and water solution or combustible gas detector. A GAS-
Mate
0119 or equivalent is recommended.
®
ƒ Components Requiring Ventilation to the
Outdoors
The SKP25 regulating gas valve has independent certification
as a ventless regulator and does not require ventilation to
the outdoors. The port marked "AIR" on the actuator is not a
gas vent connection, connecting a vent line to this port may
cause operational issues.
An authority having jurisdiction (AHJ) may not permit the
use of a vent limiter on some or all components. If venting is
required, use the following general guidelines:
Drill an appropriately sized penetration for each vent
ƒ
line through the topmost panel on the rear of the boiler
cabinet (Figure 11). Do not install any vent lines through
removable latching panels. Properly seal around the
pipe with silicone to maintain a sealed cabinet and
ensure combustion air will not bypass the filter.
Tender No. MET21-117
Questions? Please Contact Your Local Manufacturer's Representative
TABLE 3 - SCH 40 PIPE NATURAL GAS CAPACITY
Equivalent Pipe Length
90 Elb
Tee
Feet
Feet
(meter)
(meter)
3.45 (1.05)
6.9 (2.10)
4.02 (1.22)
8.04 (2.45)
5.17 (1.57)
10.3 (3.13)
6.16 (1.87)
12.3 (3.74)
7.67 (2.33)
15.3 (4.66)
10.10 (3.07) 20.2 (6.15)
10.10 (3.07) 23.60 (7.19) -----
13.30 (4.05) 29.10 (8.86) -----
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
Max Capacity in ft3 of natural gas per hour. 14"wc pressure.
Pressure drop of 0.5"wc. Equivalent length of pipe (feet)
20
40
60
950
-----
-----
1460
990
810
2750
1900
1520
4350
3000
2400
7700
5300
4300
15800
10900
8800
-----
-----
-----
-----
Each component must have a separate vent line to
ƒ
the outdoors. Vent lines must not be manifolded or
combined with any other vent or exhaust systems.
Start with the vent connection size and as soon as it is
ƒ
practical, increase the pipe size one diameter. For every
ten feet of vent, increase the pipe size one diameter.
Never reduce the vent size.
ƒ
Protect the vent termination from debris, dust and
insects. Install the vent termination above the snow
line and point down to prevent ingress of water. The
termination must be a minium of 3 ft (0.9 m) from a
source of ignition.
When required,
run the vent
line(s) through
this panel
FIGURE 11 - TOPMOST REAR PANEL
INSTALLATION
80
100
150
-----
-----
-----
-----
-----
-----
1300
1150
950
2050
1850
1500
3700
3250
2650
7500
6700
5500
-----
20200
16503
-----
41200
33660
Addendum #5 Page 22 of 105
200
-----
-----
800
1280
2280
4600
12766
29128
2-15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr 1000Endura edr 1500Endura edr 2000

Table of Contents