SECTION 2
EDR-PURE-IOM-210617
Figure Notes:
1. Header must be slightly pitched toward the drain.
2. Header material must be CPVC, galvanized steel, or
stainless steel.
3. Header should be taken to the lowest point possible
and remain flooded during operation.
4. The condensate drain trap outlet must be below the
condensate outlet if the boiler.
5. For multiple boiler installation, maintain minimum pipe
size of one inch (25.4 mm) for the header piping.
6. The maximum capacity to attach per multiple boiler
condensate drain trap is 12 MMBH total.
7. Housekeeping pad required, minimum 4 inch (102 mm).
Tender No. MET21-117
Questions? Please Contact Your Local Manufacturer's Representative
HEADER MUST BE AT
FLOOR (NOT PAD) HEIGHT
FIGURE 14 - CONDENSATE DRAIN PIPING FOR MULTIPLE ENDURA BOILERS
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
INSTALLATION
0.25" (U.S.) tapping
provided for water
connection to
maintain water seal.
DETAIL A
CONDENSATE
DRAIN KIT
Addendum #5 Page 26 of 105
DETAIL A
See Note 4
2-19