Install Condensate Drain; Single Boiler Drain Trap; Multiple Boilers Sharing A Common Drain Trap - FULTON Endura EDR 750 Nstallation, Operation And Maintenance Manual

Condensing hydronic boilers 750,000 - 2,000,000 btu/hr featuring pure control
Hide thumbs Also See for Endura EDR 750:
Table of Contents

Advertisement

SECTION 2
EDR-IOM-2014-0318
For every ten feet of pipe run, increase the pipe size one diameter.
Protect the vent termination from water, dust and insects.

Install Condensate Drain

A condensate drain kit is intended for use with the Fulton Endura boiler.
 Single Boiler Drain Trap
The condensate drain kit is Fulton Part Number 4-57-005500. The drain kit must
be confi gured one per boiler, with a maximum of 4.0 mm BTU total.
Adhere to the following for installation:
1. The 1 inch (25.4 mm) condensate drain will be reduced and connected to
the 3/4 inch (19.05 mm) inlet on the base of the drain kit.
2. A condensate collecting tank and condensate pump will be required if a
fl oor drain is not available to collect condensate (collecting tank and pump
are not supplied with the boiler).
3. All piping (Figure 4) must be galvanized or stainless steel, and be free of
leaks. Copper, carbon steel/iron pipe, PVC or CPVC are not acceptable.
4. The 3/4 inch (19.05 mm) drain outlet must remain below the 1 inch (25.4
mm) boiler condensate drain.
5. Connect the 3/4 inch (19.05 mm) drain outlet to an appropriate waste line
following applicable codes. The 3/4 inch (19.05 mm) drain connection on
the drain tank must be the highest point prior to going to the drain. Failure
to keep drain piping lower than this point will result in overfl ow of the
drain tank. Slope the drain pipe away at a minimum pitch of 1 inch (25.4
mm) for every 12 feet (3.65 m).
 Multiple Boilers Sharing A Common Drain Trap
The condensate drain kit is Fulton Part Number 4-57-000440. The maximum
number of units to attach per condensate drain kit is 12mm BTU total.
Adhere to the following for installation:
1. The Fulton Endura boiler 1 inch (25.4 mm) condensate drain will be
connected to the 1 inch (25.4 mm) inlet on the drain kit. One or more drain
lines may be connected to this inlet (max of 12 MM BTU per drain).
2. If the water supply must be temporarily disconnected, the boilers must be
turned off to prevent accidental fl ue gas emission into the boiler room.
3. The condensate drain cover must be kept on at all times, except during
maintenance of the drain. This drain should be checked regularly in your
boiler maintenance schedule.
4. A condensate collecting tank and condensate pump will be required if a fl
oor drain is not available to collect condensate (collecting tank and pump
Tender No. MET21-117 ADDENDUM #3
Questions? Please Contact Your Local Manufacturer's Representative
Design & Build RFP: Gas Heating Upgrade
Replacement in Dartmouth
INSTALLATION
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
If the water supply must be
temporarily disconnected from the
condensate drain trap, the boilers
must be turned off to prevent
accidental fl ue gas emission into the
boiler room.
4
CAUTION
An uninterruptible water supply is
required and shall be connected to the
¼" (U.S. only) compression fi tting on
the condensate drain. The water supply
maintains a water level in the drain kit
to prevent accidental fl ue gas emission
into the boiler room.
Page 37 of 88
2-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Endura edr 1000Endura edr 1500Endura edr 2000

Table of Contents