Prince Antec Controls Retrofit Manual page 15

Venturi valve
Table of Contents

Advertisement

Flow Signal
Venturi POT
Pressure Signal
14 | VVR– Manual | AntecControls.com
STEP 11C
Wire the:
1.
Actuator signal wire to AO1 on the LMX.
2.
POT cable to the Venturi POT terminal on the LMX.
3.
Flow and pressure signal into the FLO SIG and PRESSURE SIG terminal blocks,
respectively.
4.
Power into the power terminal block on the LMX.
Power
STEP 12
Attach pressure tubing to pressure taps on the valve. Connect the red tube to the high
pressure side (inlet) and the green tube to the low pressure side (discharge).
STEP 13
Route the other end of the pressure tubing through the knockout holes to the Pace pressure
taps. Connect the red tubing to the high pressure side (H) and the green tubing to the low
pressure side (L).
NOTE:
marked with red is for high pressure.
STEP 14
Once power is turned on to the unit, please proceed to the
instructions to configure the controllers POT curves.
For the LMX and FHC the tap marked with green is for low pressure and the tap
VVR - MANUAL
POT Curves
section for

Advertisement

Table of Contents
loading

Table of Contents