Prince Antec Controls Retrofit Manual page 12

Venturi valve
Table of Contents

Advertisement

VVR - MANUAL
STEP 7A
Mount the PACE below the top tab insert on the encloure. There must be a minor gap so the
lid of the enclosure can slide on after.
STEP 7B
Pressure ports must be mounted facing the right hand side of the enclosure.
PACE is mounted a minimum of 3" from the right side of the enclosure.
3"
STEP 7C
PACE is mounted above the base channnel on the valve.
11 | VVR– Manual | AntecControls.com

Advertisement

Table of Contents
loading

Table of Contents