INSTALLATION INSTRUCTIONS
Checking Miscellaneous Components
[1] Check that the following components operate:
(a) DRYER BLOWER and HEATER
(b) WATER SUPPLY SOLENOID — Listen for the sound of water entering the PROCESSOR.
(c) EXHAUST BLOWER
Checking the DISPLAY PANEL
[1] Check that the green "Ready" light on the DISPLAY PANEL illuminates after the PROCESSOR has been
allowed to warm-up for approximately 15 minutes at 26°C (72°F) ambient conditions and 26°C (72°F) water
temperature.
[2] Check that the DEVELOPER temperature illuminated on the DISPLAY PANEL is in the operating range
between 35° and 38.3°C (95° and 101°F).
Checking the Transport
Feed one sheet of processed 35 x 43 cm (14 x 17 in.) film into the PROCESSOR to check that the transport system
and the REPLENISHMENT PUMPS operate correctly.
40
January 1996 – 5B6339