Section 6: Final Steps
[1] De-energize the PROCESSOR by moving the MAIN CIRCUIT BREAKER CB1 to the "OFF" position.
[2] Drain the TANKS of water by opening the FIXER and DEVELOPER DRAIN VALVES.
[3] Close the FIXER and DEVELOPER DRAIN VALVES.
[4] Install all PANELS and the TOP COVER.
[5] Do the setup procedures in the Operator Manual.
Important
After the PROCESSOR has been in regular use for 1 or 2 days, again check all FITTINGS for leakage. If necessary,
tighten any loose connections.
5B6339 – January 1996

Final Steps

41