Barco OVERVIEW D 50" Installation Manual page 39

Table of Contents

Advertisement

To install the wall fixation at the display wall, proceed as follows:
Take the fixation bracket [4] and attach it to the profile of the dark box (linear setup of the display wall)
using the screws M6x40 [1] and the washers U-6-125 [5]. In case of a polygonal setup, the bracket is
attached to the polygonal connection bracket.
Position the profile [7] and apply the bushing [8] (either on top of the profile as shown in the drawing, or
beneath the profile).
Insert the screw M10 [9].
Use the washer [11] and nut [10] to fix it.
The following picture shows a sketch about the fixation on the wall of the building:
Attach the wall fixation bracket to the end of the profile by means of M10x85. Use the spring washer and nut to
fix it.
Position the bracket at the wall of the building, and mark the position to drill the holes.
Remove the profile from the bracket to be attached to the wall of the building (otherwise drilling and
fixation is very difficult!).
Use two dowels FUR 10 to attach the fixation bracket to the wall of the building.
Reattach the profile to the bracket now fixed to the wall of the building.
OverView D 50" – DOC-3303-5 – installation manual – Revision 10 – September 2006
connection bracket, fixation points for linear wall fixation
September 2006 ________________________________
_________________________________________________________
________________________________
________________________________
September 2006
September 2006
5. Wall fixation
wall fixation, side of wall of the building
_________________________ 5-2
_________________________
_________________________
Figure 5-3
Figure 5-4

Advertisement

Table of Contents
loading

This manual is also suitable for:

Overview mdg50-dlOverview mdr50-dlOverview mdr+50

Table of Contents