Barco OVERVIEW D 50" Installation Manual page 32

Table of Contents

Advertisement

The horizontal movement screws of all screens right to the static screen look in the same
direction.
The horizontal movement screws of all screens left from the static screen also look in the
same direction, but opposite to the horizontal movement screws of the screens right to
the static screen.
Never drill only one of the horizontal movement screws completely out before turning
the seconed!
Make several turns on one screw and than go to the second, turn it, go back to the first
... continue until the gap is closed.
OverView D 50" – DOC-3303-5 – installation manual – Revision 10 – September 2006
All other screens of the bottom row are
installed following the procedure below:
Apply the 4x2 screws to block the vertical
movement.
Screw in the horizontal movement screws until
the screen front is moved approx. 1mm against
the vertical frame towards the horizontal
movement screw.
Hang the screen on the pins. Make sure that
the horizontal movement screws always show
towards the border of the display wall – this
means that the left neighbor of the static
screen is
right neighbor of the static screen.
Lock the 4 securing screws from behind.
After locking the screen there will be a screen
gap to the neighbored screen of around 1mm.
To close this gap, drill out (turn left) the
horizontal movement screw.
The screen is now moving and the gap will be
closed.
Completely remove the horizontal movement
screws!
September 2006 ________________________________
_________________________________________________________
________________________________
________________________________
September 2006
September 2006
3. Installation of Screen Module
rotated by 180° compared to the
_________________________ 3-8
_________________________
_________________________
Step5
Step6
Step7
Step8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Overview mdg50-dlOverview mdr50-dlOverview mdr+50

Table of Contents