Barco OVERVIEW D 50" Installation Manual page 120

Table of Contents

Advertisement

When the screen to start de-installation has been defined,
turn in the two horizontal movement screws of this screen until the screen front is moved approx. 2mm against
the vertical frame towards the horizontal movement screw.
Only when there is a gap of 2mm to the adjacent screen, from the rear side of the display
wall unlock the 4 securing screws of this screen and de-mount this screen
On the screen, mark it's position in the display wall!
Proceed with the next screen, provided this is not the screen above the static screen.
Otherwise proceed with the most left screen of the top row.
It is the screen above the static screen which is the last one to be de-installed in a row!
Since horizontal movement of this screen is locked, there is no need to turn in the
horizontal movement screws.
When all screens of the top row are de-installed, proceed with the next row. The de-installation sequence and
procedure is identical to the procedure of the top row.
Proceed until all screens are de-installed.
OverView D 50" – DOC-3303-5 – installation manual – Revision 10 – September 2006
September 2006 ________________________________
________________________________________________________
________________________________
________________________________
September 2006
September 2006
11. De-mounting the seamless screens
________________________ 11-2
________________________
________________________

Advertisement

Table of Contents
loading

This manual is also suitable for:

Overview mdg50-dlOverview mdr50-dlOverview mdr+50

Table of Contents