Prior to accepting a shipment from the carrier, the containers should be inspected for
damage. If any dents or major scratches, cuts, etc. are evident, a damage claim should be
filed with the carrier. Only after incoming inspection and operational tests of the Brewer are
successfully completed, should the shipment be accepted.
These instruction lead an installer through the Setup of a Brewer Spectrometer.
Since Brewers are usually operated at some distance from the Computer Equipment, (probably out
of doors, and out of site of the Computer room), the setup will be done in two stages. The Brewer
will first be set up and tested in close proximity to the Computer, and then it will be installed at its
final location.
Before starting, ensure that correct AC voltage is availabe as per the diagram in Figure 3.1 and
Table 3.1.
Figure 3.1: AC Power Voltages
Table 3.1
AC Power Connector Voltages
measured voltages between
ground & neutral
ground & hot
neutral & hot
REFER TO FIGURES 3.2 and 3.3 FOR THE FOLLOWING SETUP
The complete Brewer Spectrometer system consists of the following:
a Spectrophotometer
an Azimuth Tracker
a Tripod Stand
a Control and Data Logging Computer (optionally from KIPP & ZONEN)
a set of Interconnect Cables
a set of Basic Spare Parts
a set of Optional Spare Parts
other Optional parts
230VAC installations
0 VAC
240 VAC
240 VAC
MKIII OPERATOR'S MANUAL
3. BREWER SYSTEM SETUP
120VAC installations
0 VAC
120 VAC
120 VAC
23