Pre-Installation Requirements; Installing An Eps-C2 Power Supply - Extreme Networks ExtremeSwitching X440-G2 Series Hardware Installation Manual

For switches using extremexos 21 or 22
Hide thumbs Also See for ExtremeSwitching X440-G2 Series:
Table of Contents

Advertisement

Caution
Before installing or removing any components of the system, or before carrying out any
maintenance procedures, read the safety information provided in
Information
shock.
Caution
Be sure that proper ESD controls are in use before switch maintenance is performed. This
includes but is not limited to wrist straps that are grounded to the switch chassis and earth
grounds.
Note
See "Technical Specifications" for additional information regarding regulatory compliance
certifications.

Pre-installation Requirements

You need the following tools and equipment to install an external power supply:
# 1 Phillips screwdriver
Rack mount screws suitable for your organization's equipment rack
Screwdriver suitable for use with your rack-mount screws
AC power cord
An AC power cord is not included with the external power supply. Obtain a power supply cord that
meets the requirements listed under
Power Supplies
Note
When you connect an external power supply, consider all of the equipment that is connected
to the power supply circuit to ensure that the circuit is not overloaded. Use proper overcurrent
protection, such as a circuit breaker, to prevent overcurrent conditions.
The switch and each redundant power supply source should be plugged into separate branch
circuits to provide redundancy.

Installing an EPS-C2 Power Supply

Install one, two, or three Summit 750 W AC power supplies (model 10931) in the EPS-C2 chassis (model
10936) to build an external redundant power system for one or more compatible switches
One redundant power cable is shipped with the EPS-C2 chassis to provide the connection between the
external power system and the redundant power input connector on the back of a switch. Additional
redundant power cables are available from Extreme Networks.
When installing an EPS-C2 chassis at the same time as a switch, install the components in the following
order:
1
Install the switch into a rack.
ExtremeSwitching and Summit Switches: Hardware Installation Guide
on page 396. Not following these precautions can result in equipment damage or
Power Cord Requirements for AC-Powered Switches and AC
on page 393.
Installing External Power Supplies
Safety and Regulatory