Installation - SMC Networks ISA3 Series Operation Manual

Digital gap checker pressure switch
Hide thumbs Also See for ISA3 Series:
Table of Contents

Advertisement

■Installation

: Connect piping before mounting to the DIN rail or bracket.
(1) If the piping is connected while the product is mounted on a bracket or DIN rail, the bracket or DIN rail
might be bent.
(2) If the piping is connected while the display is held with a vice, the display might be damaged.
(3) If a tool comes into contact with the boss, it might be broken. Therefore, connect the piping carefully.
○DIN rail
Mounting
(1) Hook the claw part 1 to the DIN rail.
(2) Push the claw part 2 down until it clicks.
Removal
(1) Pull the DIN rail mounting latch downward for unlocking.
(2) Pull out the OUT port (detection port) side.
-31-
3
Installation
No.PS※※-OMW0009-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Isa3-fIsa3-gIsa3-h

Table of Contents