NAiS FP Series Hardware Manual page 126

Programmable controller
Hide thumbs Also See for FP Series:
Table of Contents

Advertisement

FP0 Hardware
Isolate the wiring systems to the FP0, input/output devices,
and motor devices.
Circuit breaker
The power supply sequence should be set up so that power to
the control unit is turned OFF before the input/output power
supplies.
If the input/output power supplies are turned OFF before the
power to the control unit, the FP0 control unit may detect a
drop in the input level, and malfunction.
Be sure to supply power to a control unit and an expansion
unit from the same power supply, and turn the power ON and
OFF simultaneously for both.
Matsushita Electric Works (Europe) AG
9.2
Wiring the Power Supply to the Control Unit
Motor
devices
Insulated
I/O devices
DC
power
supply
Insulated
DC
FP0
power
supply
9-5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fp0

Table of Contents