Angelo Po 090BM1E Use And Installation Manual page 33

Electric bain-marie
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 19
6 - Remove the test voltage indicator sticker from
the dataplate and apply the new one to identify
the voltage being used
Important
On completion of the operation make sure
that there are no malfunctions.
WATER CONNECTION
To make the connection, connect the mains line to
the appliance's connection pipe, fitting a shut-off
tap (A), to allow the water supply to be cut off when
necessary. Easily accessible filters must be fitted
downstream of the tap.
Description
Pressure
pH
Conductivity
Hardness
Salt and metallic ion con-
tent
Chlorides
Sulphates
Iron
Copper
Manganese
TESTING OF THE APPLIANCE
Important
Before it is put into service, the system
must be tested to check the operating con-
ditions of every single component and
identify any malfunctions. In this stage, it is
important to check that all health and safety
requirements have been complied with in
full.
To test the system, make the following checks.
1 - Check that the mains voltage is the same as
that of the appliance.
Value
200÷450 kPa (2÷ 4,5 bar)
7÷7.5
< 200 mS/cm
9÷13°f (5÷7°d, 6.3÷8.8°e,
90÷125 ppm)
< 30 mg/l
< 40 mg/l
< 0,1 mg/l
< 0.05 mg/l
< 0,05 mg/l
- 15 -
A
Caution - warning
The appliance must be supplied with drinking
water having the characteristics shown in the
table.
2 - Operate the appliance's circuit-breaker to
check the electrical connection.
3 - Check that the safety device is operating cor-
rectly.
After testing, if necessary instruct the user in all the
skills necessary for putting the appliance into oper-
ation in conditions of safety, in accordance with le-
gal requirements.
IDM-3960200250.tif
IDM-39615701600.tif
IT
GB
DE
FR
ES
English

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

190bm2e

Table of Contents