Wet Down Wash

The Wet Down process is the first step that the opening person should do to prepare the wash for the first
customer. When selected, the process is setup to activate all relays (outputs) which have been designated
to turn on during the Wet Down cycle. The cycle time is setup in the Wash Settings menu. By wetting down
the cloth equipment and perhaps charging the foaming manifolds in the wash, the wash will be prepared to
process the first vehicle, and provide a more consistent wash to the customer.
Follow these steps to start a wet down at the Tunnel Master® Jr. display:
Item
1
Bump Shift
2
Wet Down Wash
3
Configure Wash
4
View Counts
5
Print Reports
Table 5-1. Main Wash Menu
Chapter 5: Operating Procedures
Menu Option
Function
When selected this menu option will print a
report, if a report printer is attached, and ask if
the operator wishes to close (Bump) the current
shift.
This option allows the user to activate
any equipment outputs, which have been
designated to activate whenever the operator
chooses this wet down option.
Allows user to configure wash settings and
services, explained in-depth. See "Wet Down
Wash" on page 49.
This menu gives the ability to view counts,
number of times the various services have been
processed during the current shift.
From this menu option a user can print various
financial reports, if there is an optional report
printer attached to the controller.
Tunnel Master® Jr. User Manual
- Page 48

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Tunnel Master Jr. and is the answer not in the manual?

Table of Contents