Preparing The System For Operation - IBM 9080-M9S Manual

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

Figure 264. Replacing a miscellaneous A voltage regulator module
Preparing the system for operation after removing and replacing a
miscellaneous A voltage regulator module
To prepare the system for operation after removing and replacing a miscellaneous A voltage regulator
module, complete the steps in this procedure.
Procedure
1. Ensure that you have the electrostatic discharge (ESD) wrist strap on and that the ESD clip is plugged
into a ground jack or connected to an unpainted metal surface. If not, do so now.
2. Replace the service access cover by completing the following steps.
a) Slide the cover (A) onto the system unit as shown in the following figure.
b) Close the release latch (B) by pushing it in the direction shown in the following figure.
Miscellaneous VRMs 307

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents