IBM 9080-M9S Manual page 348

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

Figure 293. Removing the UPIC cable from the system node
e) If needed to allow for more slack in the SMP cables, label and unclip the SMP cable bundle from the
side of the cable management bracket as shown in the following figure, and move the SMP cables
to near the center of the system node.
342 Power Systems: Removing and replacing parts in the 9080-M9S system

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents