IBM 9080-M9S Manual page 380

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

Figure 320. Replacing the UPIC cable into the system node
4) Lightly pull on the UPIC cable from both attachment points to ensure it is locked into place.
Pull the cable connector; do not pull on the wire. The cables should be firmly attached to the
system.
b) Repeat step "5.a" on page 372 until all the UPIC cables previously identified are reconnected to
the system node you are servicing.
c) If applicable, secure the cable to the side of the rack with the hook-and-loop fastener.
6. Using your labels, reconnect the service processor (FSP) cables that you removed from the system
node you are servicing.
374 Power Systems: Removing and replacing parts in the 9080-M9S system

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents