Table 1. Service processor (FSP) cable locations
Drawer
ND4 (top)
ND3
ND2
ND1 (bottom)
3. Plug the service processor cable being serviced into the system control unit by inserting the cable into
the connector until it locks into place.
Service processor cable locations are SC1-P1-T2, T3, T4, T5, T6, T7, T8, and T9.
Attention: Do not drop or damage the metal connectors on the cable. If the metal connectors
are bent or damaged, they need to be replaced.
Figure 18. Replacing the service processor cable into the system control unit
4. Plug the service processor cable being serviced into the system node by inserting the cable into the
connector until it locks into place.
20 Power Systems: Removing and replacing parts in the 9080-M9S system
Cable
Cable Length
A
1330 mm (4.36 ft) SC1-P1-T7
B
1330 mm (4.36 ft) SC1-P1-T9
A
1110 mm (3.64 ft) SC1-P1-T6
B
1110 mm (3.64 ft) SC1-P1-T8
A
855 mm (2.81 ft)
B
855 mm (2.81 ft)
A
355 mm (1.16 ft)
B
355 mm (1.16 ft)
From
To
ND4-P1-C9-T2
ND4-P1-C10-T2
ND3-P1-C9-T2
ND3-P1-C10-T2
SC1-P1-T2
ND2-P1-C9-T2
SC1-P1-T4
ND2-P1-C10-T2
SC1-P1-T3
ND1-P1-C9-T2
SC1-P1-T5
ND1-P1-C10-T2