IBM 9080-M9S Manual page 547

Hide thumbs Also See for 9080-M9S:
Table of Contents

Advertisement

Figure 472. Replacing the front screws
4. Review the following information to identify the locations where each SMP cable connects to the
system node that you are servicing. Then, refer to your labels and the following steps to reconnect
the SMP cables that you removed from the system node you are servicing.
• If you have a two node system configuration, use Figure 473 on page 542 and Table 55 on page
542 to determine the point-to-point cabling for SMP cables.
Processor VRM 541

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents