UPIC cable locations are P1-C1-T1 and P1-C2-T1.
a. Ensure that the white plastic lock is pulled back from the plug housing.
b. Plug the UPIC cable (A) into the previously identified location in the system control unit by inserting
the cable into the connector until it locks into place.
Figure 368. Replacing the UPIC cable into the system control unit
c. Push the white plastic lock (B) onto the plug housing.
Figure 369. Replacing the UPIC cable into the system control unit
d. Lightly pull on the UPIC cable from both attachment points to ensure it is locked into place. Pull the
cable connector; do not pull on the wire. The cables should be firmly attached to the system.
5. When the service processor comes up to the Flexible Service Processor (FSP) standby state (the
power-on LED on the control panel is flashing slowly), continue to the next step.
6. Access the ASMI and run the Cable Plugging Validation utility to validate all of the cables.