Parts and Tools Required
In addition to the microinverters, PV modules, and racking, you will need the following:
Enphase Equipment
•
Enphase Envoy-S gateway required to monitor solar production. For installation
information, refer to the Enphase Envoy-S Installation and Operations Manual.
•
Enphase Installer Toolkit
Download the Enphase Installer Toolkit mobile app and open it to log in to your
Enlighten account. With this app, you can scan microinverter serial numbers and
connect to the Envoy-S to track system installation progress. To download, go to
enphase.com/toolkit
•
Enphase Q Relay, single phase (Q-RELAY-1P-INT) or Enphase Q Relay, multiphase (Q-
RELAY-3P-INT)
•
Tie wraps or Cable Clips (ET-CLIP-100)
•
Enphase Sealing caps (Q-SEAL-10) for any unused drops on the Enphase Q Cable
(optional)
•
Enphase Terminator (Q-TERM-R-10 for single phase or Q-TERM-3P-10 for multiphase)
One for each AC cable segment end; typically two needed per branch circuit.
•
Enphase Disconnect Tool (Q-DISC-10)
•
Enphase Q Cable:
Cable Model
Connector
Spacing
Single-phase
Q-25-10-240
1.3m
Q-25-10-240-A*
Q-25-17-240
2.0m
Q-25-17-240-A*
Q-25-20-200
2.3m
Q-25-20-200-A*
Multiphase
Q-25-10-3P-200
1.3m
Q-25-17-3P-160
2.0m
Q-25-20-3P-160
2.3m
* Models with "-A" designation for use only in Australia and New Zealand.
•
Raw Q Cable: (Q-25-RAW-300/ Q-25-RAW-300-A* for single-phase, Q-25-RAW-3P-300
for multiphase) Length 300 meters. Raw cable with no connectors. (optional)
Other Items
•
Field Wireable Connectors (Q-CONN-R-10M and Q-CONN-R-10F): optional male and
female connectors (optional)
•
Number 2 and 3 screwdrivers
•
Wire cutters, voltmeter
•
Torque wrench, sockets, wrenches for mounting hardware
11
IQ 7 / IQ 7+ / IQ 7X / IQ 7A Installation and Operation
or scan the QR code at right.
PV Module Orientation
Portrait
Landscape (60- and 96- cell)
Landscape (72-cell)
Portrait (all)
Landscape (60- and 96-cell)
Landscape (72-cell)
© 2020 Enphase Energy Inc. All rights reserved.
Connector Count per
box
240
240
200
200
160
160
141-00044-02