Site Audit Form - Bennett Horizon 2 Series Installation Manual

Electronic with 708 electronics
Table of Contents

Advertisement

Bennett Pump Company
1218 E. Pontaluna Road
Spring Lake, MI 49456
Fax : 231– 799– 6202
Model of Dispensers and Serial Numbers
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
___________________________________
Type of Interface Box being used for the Fuel Communications to the P.O.S?
Type of Interface Box being used for the Card Reader Communications to the P.O.S?
Point of Sale system being used? ___________________
Yes
No
Is the distance between the dispensers and the Interface Box less than 500 feet?
Are the field wires in metal conduit only?
Is there a conduit dedicated for each dispenser?
Are the dispenser field wires Oil and Gas resistant, color coded, THHN, copper stranded?
Are the card reader field wires twisted as per Installation Manual? (If Applicable).
Are the field wires continuous with no splices?
Is the resistance measurement between Ground and Neutral at the dispenser less than one(1)ohm?
Attach photo(s) (if possible) showing this measurement.
Are there no more than 2 dispensers on one breaker (maximum)?
Are the dispensers on dedicated breakers and not sharing power with any other equipment (Sub Pumps, pump motors, air
conditioners, coolers etc..)?
Do the supply tanks have fuel?
Are all suction components installed per Bennett specifications?
Are the Interface boxes within 100 feet of the Point of Sale? (If Applicable).
Is the vapor seal on field wires in the dispenser head installed?
Is the dispenser mechanically mounted to the island using securing bolts and shimmed for squareness?
Is there an emergency cutoff shear valve mounted on each product inlet on remote dispensers?
Does each dispenser have the low grade coming into the left product inlet on side 1?
Is the Pump Controller Interface box on the same phase of power as the dispensers?
Are all of the dispensers on the same phase of power?
Is an approved emergency stop relay installed and working properly for the fuel court area?
If this is a remote dispenser, are there RC Networks on the sub pump relays?
Have the meter calibrations been verified?
Was the Bennett Warranty statement reviewed with the station Manager / Owner?
Name of Owner / Manager? _________________________________________
Were all Bennett installation instructions in the Installation Manual followed? (If not, please list on the next page.
Horizon 2 Audit Form
Bennett Pump Company
Site Audit Report
This form must be filled out and sent in to
Bennett to establish the equipment warranty.
Horizon 2 Dispensers.
Site Information:
Site Phone Number
Site Name
Site Address
City
Owned by
Equipment Purchase Date
Equipment Installation Date
Software version on P.O.S.
Checklist
31
Audit Form 108422
Date of Audit
Date of Installation
______________
State
Zip
105894 Rev G 12-6-16