Pump Alternation Control Operation; Relay Sampling Operation - Ametek DDMC Instruction Manual

Analog input process meter / controller
Table of Contents

Advertisement

DDMC Analog Input Process Meter / Controller

Pump Alternation Control Operation

Relay Sampling Operation

When the signal crosses the set point, the relay trips and the sample time starts. After the sample time has elapsed,
the relay resets. The cycle repeats every time the set point is crossed, going up for high alarms and going down for
low alarms.
The sample time can be programmed between 0.1 and 5999.9 seconds.
30
Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents