Tools Required; Unpack And Inspect The System; Contents Of Adtran Shipment - ADTRAN Total Access 544R System Manual

Adtran total access 544r: system manual
Hide thumbs Also See for Total Access 544R:
Table of Contents

Advertisement

Section 3 Network Turnup Procedure
1.
INTRODUCTION
This section discusses the unit installation process.
2.

TOOLS REQUIRED

The tools required for unit installation are:
Screws (customer-provided for wallmount installation)
Screwdriver (for wall or rackmount installation)
To prevent electrical shock, do not install equipment in a wet location or during a
lightning storm.
During installation, power should be the last connection made.
Electronic modules can be damaged by static electrical discharge. Before handling
modules, wear an antistatic discharge wrist strap to prevent damage to electrical
components. Place modules in antistatic packing material when transporting or storing.
When working on modules, always place them on an approved antistatic mat that is
electrically grounded.
3.

UNPACK AND INSPECT THE SYSTEM

Each unit is shipped in its own cardboard shipping carton. Open each carton carefully and avoid deep
penetration into the carton with sharp objects.
After unpacking the unit, inspect it for possible shipping damage. If the equipment has been damaged in
transit, immediately file a claim with the carrier, and then contact ADTRAN Customer Service (see the
contact information in the front of this manual).

Contents of ADTRAN Shipment

Your ADTRAN shipment of the Total Access 544R includes the following items:
Mounting Instructions (P/N 64200600L1#T-19A)
CD
Cable Tie (P/N 3292032)
Silver Satin Cable (P/N 3127004)
Four Rubber Feet (P/N 3270BF003)
Power Cord (P/N 3127009)
2 Mounting Brackets (P/N 3265421@C)
26
© 2003 ADTRAN, Inc.
Total Access 544R System Manual
61200704L2-1B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents